VRT · US

VRT.US: Q2'26 update — AI rack power & liquid cooling infrastructure

Vertiv posted Q2 2026 net sales of $3.274B (+24% YoY) with adjusted OM 22.6% (+410bps), diluted EPS $1.27 (+53%) and adjusted EPS $1.52 (+60%). FY26 guide raised: sales $13.8–14.2B, adjusted EPS $6.65–6.75, adjusted FCF $2.4–2.6B. Q2 revenue was slightly soft versus expectations (timing/supply), driving volatile trading. The “AI rack power + liquid cooling + PurgeRite acquisition” thesis is intact. See CLS cooling chain and SMCI server integration; NVDA GPU clusters anchor demand.

Published Updated Open interactive reader

Cite a section with a deep link, e.g. /en/r/vrt-us-research#thesis

Q2 2026 snapshot

Q2 net sales
USD 3.3B
Adjusted OM
0.2
Diluted EPS
USD 1.27
Adjusted EPS
USD 1.52
As of 2026-07-30

FY26 / Q3 guidance

FY26 sales
$13.8–14.2B
FY26 adj EPS
$6.65–6.75
FY26 adj FCF
$2.4–2.6B
Q3 adj EPS
$1.77–1.83
As of 2026-07-30

Thesis

Vertiv’s near-term pricing debate centers on AI rack power + liquid cooling + thermal management infrastructure. Q2 2026 validated that mix with $3.274B net sales (+24% YoY), adjusted OM 22.6% (+410bps), and adjusted EPS $1.52 (+60%). FY26 guide was raised across the board (sales $13.8–14.2B, adjusted EPS $6.65–6.75, adjusted FCF $2.4–2.6B), showing AI infrastructure demand still accelerating.

The premium holds only if:

  1. AI rack order backlog keeps building — repeatable pipeline tied to NVDA GPU cluster deployments, not one-off projects;
  2. Liquid cooling penetration rises — high-power GPU racks make liquid cooling standard, not optional;
  3. Adjusted OM expansion is sustainable — Q2 +410bps validates pricing power and mix improvement.

But Q2 revenue was slightly below expectations (timing/supply), and volatility reflects high expectations versus execution cadence. For cooling-chain context see CLS research.

Business

Model: Critical DC infrastructure — power, distribution, thermal/liquid cooling, plus services/software.

Flagships: High-density power/UPS/PDU; liquid cooling (incl. PurgeRite); services/DCIM.

Competitiveness: Power+thermal stack; higher adj. margins than pure ODMs.

Strategy: Raised FY26 guide; liquid-cooling penetration and project timing.

Value chain

Downstream DC facilities layer — rack power and cooling; complements ODM cooling parts.

Upstream: power electronics, thermal parts, PurgeRite capacity. Downstream: hyperscalers/colos/ODM partners. Risks: project timing on revenue recognition; cooling-part lead times.

Valuation

AI infrastructure themes drove a strong 2026 move. As of this note (2026-07-30), volatility picked up after Q2 revenue timing miss—valuation already prices some FY26 raise. Risk/reward is asymmetric post guide raise.

Valuation frame

Valuation frame
MetricStatusRead
盈利增长强劲Q2 销售 +24% YoY;adj EPS +60%
调整后 OM扩张22.6%(+410bps YoY)
估值波动加大Q2 收入时序偏软后回调
相对 CLS互补VRT 偏电源/整柜;CLS 偏液冷组件
催化剂FY26 上修销售 / EPS / FCF 全面上调
风险收益高预期执行节奏 vs AI 需求持续
As of 2026-07-30

Versus CLS: Vertiv is more complete on power and rack-level thermal; CLS skews liquid cooling components and CDU. Both compete/complement in the AI rack supply chain. Versus Eaton: traditional electrical giants also compete for AI power distribution share.

Financial trend (~24 months)

Eight-quarter revenue and gross margin with YoY and QoQ. Semi/AI hardware seasonality is secondary to supply, ASP, and order timing.

Revenue · last 8 quarters

Interactive chart available in the reader.

Company filings (approx.; see body for basis) · As of 2026-07-30

Gross margin · last 8 quarters

Interactive chart available in the reader.

Company filings (approx.; see body for basis) · As of 2026-07-30

Operations

Q2 2026 operations

Q2 P&L and segments

Q2 P&L and segments
ItemQ2 2026Note
净销售$3.274B+24% YoY;略低于预期
调整后 OM22.6%+410bps YoY
稀释 EPS$1.27+53% YoY
调整后稀释 EPS$1.52+60% YoY
收入时序偏软项目交付 / 供应节奏
As of 2026-07-30

Segment mix (illustrative)

Segment mix (illustrative)
SegmentRevenue mixWatchpoint
Critical Infrastructure~55%数据中心电源 / 热管理
Integrated Solutions~30%整柜 / 模块化方案
Services & Software~15%运维 / 监控
AI 相关增量最快增量Blackwell / Rubin 集群拉动
As of 2026-07-30

Takeaways:

  • Adjusted OM 22.6% (+410bps) is the headline—validates pricing power and AI high-ASP product mix.
  • Revenue $3.274B slightly missed — management cited project timing and supply chain cadence; backlog remains strong but revenue recognition lagged.
  • Adjusted EPS $1.52 (+60%) shows margin expansion partly offset timing impact.

AI rack infrastructure

AI rack infrastructure is Vertiv’s most credible growth engine today. NVIDIA Blackwell / Rubin GPU clusters with rising per-rack power (30kW+) drive:

  1. High-density power and distribution — UPS / PDU / busway upgrades;
  2. Liquid cooling systems — CDU / cold plates / piping; PurgeRite acquisition strengthens capability;
  3. Thermal management and monitoring — rack-level temperature / flow monitoring and ops software.

Watch AI rack order backlog, liquid cooling penetration, turnkey integration with SMCI and other ODMs, and project delivery timing.

PurgeRite & product chain

The PurgeRite acquisition (2026) strengthens Vertiv’s liquid cooling capacity and IP—key incremental for FY26–FY27 liquid cooling penetration. Vertiv’s product chain covers:

  • Critical Infrastructure — data center UPS, power distribution, thermal management (~55% revenue);
  • Integrated Solutions — modular data centers, turnkey racks (~30%);
  • Services & Software — ops monitoring, DCIM (~15%).

Versus CLS cooling chain: CLS skews CDU / cold plates / quick connects; Vertiv skews rack-level power + thermal + liquid cooling system integration. Both have hyperscaler supply-chain share—competitive/complementary dynamics need ongoing tracking.

Competition

Strategy / product / risk map

Strategy / product / risk map
CategoryDetailImplication
AI 机柜电源UPS / PDU / 配电;高功率密度AI 集群基础设施刚需
液冷 / 热管理机柜级液冷;PurgeRite 收购CLS 液冷链竞争/互补
整柜集成SMCI 等 ODM 合作订单 backlog 是核心跟踪指标
需求锚NVDA GPU 集群部署CapEx 周期敏感
竞争Eaton 等传统电气 + 新进入者AI 配电份额争夺
估值FY26 上修后波动加大高预期下执行节奏是关键
As of 2026-07-30

Three axes:

Axis Vertiv CLS Eaton
AI racks Power + liquid cooling + rack thermal Liquid cooling components / CDU Traditional distribution + AI push
Integration ODM partnerships (SMCI, etc.) Direct to ODM / hyperscaler Electrical system-level
Demand anchor NVDA GPU cluster deployments Liquid cooling penetration AI power distribution share

Under Giorgio Narazano, Vertiv focuses on high-growth AI infrastructure segments, bolsters liquid cooling via PurgeRite and similar deals, and maintains adjusted OM expansion. Q2 revenue timing is a near-term noise item; FY26 guide raise validates mid-cycle demand strength.

Peer comparison

Peer comparison
CompanyShare / roleGMStrengthWeakness
Vertiv (self)AI rack power/coolingAdj OM ~23%Thermal + power stackProject timing volatility
CelesticaCDU / rack cooling partsMfg OM ~8%ODM attachLower margin pool
EatonElectrical / PDUMid-30sElectrical scaleLess liquid-cooling focus
Super MicroServer + DLC integrate~15%Rack speedNot facility infra
As of 2026-07-30

Management

CEO Giordano Albertazzi since Jan 2023 (>24m); CFO David Fallon stable. No new material 24m change. Stability: steady.

Key management (24m)

Key management (24m)
RoleNameSince24m change
CEOGiordano Albertazzi2023-01No change (CEO since Jan 2023)
CFODavid Fallon2020No change
Exec Chair / boardRob Johnson (prior) / boardCEO transition completed >24m ago; ops stable
As of 2026-07-30

Outlook

Company guide · FY26 / Q3

Company guide · FY26 / Q3
ItemGuideNote
FY26 销售$13.8–14.2B指引上修
FY26 调整后 EPS$6.65–6.75指引上修
FY26 调整后 FCF$2.4–2.6B现金流改善
Q3 销售$3.65–3.85B环比加速预期
Q3 调整后 EPS$1.77–1.83
As of 2026-07-30

Framework:

  • FY26 sales $13.8–14.2B raise confirms AI infrastructure demand; adjusted FCF $2.4–2.6B improves cash-flow expectations.
  • Q3 sales $3.65–3.85B implies sequential acceleration—key test whether Q2 timing miss was one-time.
  • PurgeRite acquisition integration progress is a 2H26 incremental.
  • Any NVDA GPU shipment delay or AI CapEx slowdown narrative directly affects Vertiv order cadence.

Scenarios

Scenario Conditions Implication
Bull Q3 sales >$3.85B; liquid cooling penetration accelerates; PurgeRite integration smooth AI infrastructure leader narrative strengthens; upside continues
Base FY26 roughly hits $13.8–14.2B; Q3 timing normalizes; OM holds 22%+ Hold through volatility; track backlog and delivery
Bear AI CapEx slows; project delays persist; CLS / Eaton take share 20–30% multiple compression possible

Positioning frame (research only): AI infrastructure allocation; avoid aggressive chase after Q2 timing miss. Track backlog, liquid cooling penetration, PurgeRite integration, Q3 revenue normalization.

Risks