TSM · US

TSM.US: Q2'26 update — advanced foundry monopoly & AI capacity pricing

TSMC posted Q2 2026 revenue of US$40.20B (+33.7% YoY, +12% QoQ), net income NT$706.56B (+77.4%), 67.7% GM and 60.3% OM. Advanced nodes (≤7nm) are 77% of wafer revenue; HPC 66%. Q3 guide US$44.6–45.8B; FY26 revenue growth slightly above +40% USD; CapEx raised to $60–64B. The advanced foundry monopoly for AI GPUs/ASICs is intact, but CoWoS packaging bottlenecks and Taiwan geopolitics remain structural discount factors. See also NVDA, ASML, AMD, INTC.

Published Updated Open interactive reader

Cite a section with a deep link, e.g. /en/r/tsm-us-research#thesis

Q2 2026 snapshot

Q2 revenue
USD 40.2B
ADR EPS
USD 4.31
Gross margin
0.7
Operating margin
0.6
As of 2026-07-16

Q3 / FY26 guidance

Q3 revenue midpoint
USD 45.2B
Q3 GM guide
1
FY26 revenue YoY
0
FY26 CapEx midpoint
USD 62.0B
As of 2026-07-16

Thesis

TSMC is the only foundry capable of scale delivery at advanced nodes for global AI compute infrastructure. Q2 2026 revenue US$40.20B (+33.7% YoY, +12% QoQ), net income NT$706.56B (+77.4%), GM 67.7% and OM 60.3% validate a core proposition: pricing power for AI GPUs/ASICs sits with TSMC, not the chip designers.

The premium holds only if:

  1. Advanced node monopoly — N3 30%, N5 33%, advanced (≤7nm) 77% of wafer revenue; Samsung Foundry and Intel Foundry still lag on yield and customer ecosystem;
  2. HPC platform dominance — 66% platform revenue maps directly to NVIDIA Blackwell, Broadcom custom ASICs, and AMD Instinct shipment slopes;
  3. CoWoS advanced packaging — capacity beyond logic dies (CoWoS-L/S) is a key bottleneck for AI cluster delivery; TSMC's ramp sets the industry ceiling.

C.C. Wei maintained FY26 revenue growth slightly above +40% USD and raised CapEx to $60–64B—a strong signal the AI CapEx cycle is still accelerating.

Business

Model: Pure-play foundry + advanced packaging (CoWoS), monetizing node leadership and utilization.

Flagships: N3/N5 logic; N2 ramp; CoWoS packaging.

Competitiveness: ~90%+ advanced-node share; packaging capacity and trust moat.

Strategy: N2 ramp, geographic diversification, CapEx ~$60–64B for AI demand.

Value chain

Mid-stream advanced manufacturing between tool vendors and chip designers.

Upstream: ASML EUV. Downstream: NVDA / AVGO / AMD / Apple. Risks: Taiwan concentration; EUV/CoWoS ramp.

Valuation

TSMC ADR (TSM) has long traded in a band of "advanced foundry monopoly premium minus Taiwan geopolitical discount." Post Q2 (~2026-07-16), expectations for N3/N2 ramp and CoWoS expansion rose further, but geopolitical risk cannot be fully diversified via Arizona / Japan / Germany fabs.

Valuation frame

Valuation frame
MetricStatusRead
营收增长强劲Q2 +33.7% YoY;FY26 指引略超 +40% USD
毛利率高位Q2 67.7%;Q3 指引 65–67%
竞争壁垒垄断级先进制程代工份额 ~90%+;N3/N5 主导 AI 芯片
CapEx上修FY26 $60–64B;N2/Arizona/Japan 扩产
地缘风险结构性折价台湾集中产能;ADR 长期含风险溢价
CoWoS 瓶颈缓解中封装产能扩张是 AI 出货斜率关键约束
As of 2026-07-16

Versus NVDA: TSMC is the "pick-and-shovel" play—GM 68% vs NVDA ~75%, but TSMC does not carry product-cycle or software ecosystem risk; multiples typically below NVDA but above traditional semis.

Versus ASML: ASML is the sole EUV equipment supplier; TSMC is its largest customer—a dual monopoly upstream/downstream in the AI capacity expansion chain.

Financial trend (~24 months)

Eight-quarter revenue and gross margin with YoY and QoQ. Semi/AI hardware seasonality is secondary to supply, ASP, and order timing.

Revenue · last 8 quarters

Interactive chart available in the reader.

Company filings (approx.; see body for basis) · As of 2026-07-16

Gross margin · last 8 quarters

Interactive chart available in the reader.

Company filings (approx.; see body for basis) · As of 2026-07-16

Operations

Q2 2026 operations

Q2 P&L and structure

Q2 P&L and structure
ItemQ2 2026Note
营收(USD)$40.20B+33.7% YoY;+12% QoQ
营收(NT$)NT$1,270.38B
净利润(NT$)NT$706.56B+77.4% YoY
EPS(NT$)NT$27.25
EPS(ADR)US$4.31
毛利率67.7%先进节点 mix 驱动
营业利润率60.3%运营杠杆显著
HPC 占比66%AI GPU / ASIC 为主力
As of 2026-07-16

Node mix

Node mix
NodeMixWatchpoint
N2(2nm)3%2025 量产起步;2026 爬坡
N3(3nm)30%Apple / NVDA / AMD 主力节点
N5(5nm)33%成熟先进;HPC 仍大量出货
N7(7nm)11%逐步向 N5/N3 迁移
先进节点(≤7nm)77%wafer revenue 占比
HPC66%platform revenue;AI 驱动
As of 2026-07-16

Takeaways:

  • HPC 66% directly maps AI demand—NVIDIA GPUs, Broadcom AI ASICs, AMD Instinct all in N3/N5 production;
  • N2 3% starts mass production; 2026–2027 is the critical ramp—N2 yield and capacity define the 2027+ AI chip performance curve;
  • GM 67.7% at historical highs reflects advanced node ASP and utilization;
  • OM 60.3% shows operating leverage—revenue +34% while profit +77%.

Node mix

TSMC's node mix is a key AI supply-chain metric:

Node Q2 mix Main customers / use
N2 3% 2025 mass-prod start; Apple / NVDA next-gen
N3 30% NVDA Blackwell, Apple A/M, AMD
N5 33% Mature advanced; heavy HPC volume
N7 11% Migrating to N5/N3
≤7nm total 77% wafer revenue

N3 + N5 at 63% is the main manufacturing node for AI chips. N2 starting at 3% will ramp through H2 2026–2027—the performance base for next-gen AI accelerators (Rubin and beyond).

AI & HPC demand

How the AI compute cycle flows through TSMC:

  1. GPUsNVIDIA Blackwell in N4/N3 production, largest single driver of HPC 66%;
  2. Custom ASICsBroadcom, Google TPU, Amazon Trainium/Inferentia, Microsoft Maia all tape-out at TSMC advanced nodes;
  3. CPUsAMD EPYC and Intel server CPUs provide the base, but AI elasticity comes from GPU/ASIC;
  4. CoWoS packaging — HBM + GPU die 2.5D/3D packaging is the physical bottleneck for AI clusters; TSMC CoWoS ramp sets industry delivery ceiling.

Key chain: ASML EUV delivery → TSMC N3/N2 capacity → CoWoS packaging → NVDA GPU shipments → SMCI / CLS server assembly. TSMC sits at the "capacity switch" in the mid-chain.

Competition

Strategy / customers / risk map

Strategy / customers / risk map
CategoryDetailImplication
先进代工N3 30%、N5 33%;N2 3% 起步AI GPU/ASIC 产能定价权在 TSMC
先进封装CoWoS / SoIC 扩产封装瓶颈 narrative 仍是行业约束
地缘分散Arizona、Japan、Germany 建厂成本更高;无法完全复制台湾效率
核心客户NVDA、AVGO、AMD、Apple、QualcommHPC 66% 反映 AI 资本开支周期
设备依赖ASML EUV 独家供应设备交付节奏影响节点爬坡
竞争Samsung、Intel Foundry 追赶份额差距仍大;Samsung 良率/生态弱
As of 2026-07-16

Three axes:

Axis TSMC Samsung Foundry Intel Foundry
Advanced nodes N3/N2 in production; 77% ≤7nm 3nm yield/customer weak 18A catching up
AI customers NVDA, AVGO, AMD, Apple Some Qualcomm Internal + limited external
Packaging CoWoS leader I-Cube catching up EMIB/Foveros
Geo Taiwan concentrated + overseas Korea + US US-focused

Samsung still faces yield and customer trust issues on GAA 3nm; Intel Foundry 18A has not won external mass-production orders. TSMC's advanced foundry share remains ~90%+ with no credible challenger near-term.

Peer comparison

Peer comparison
CompanyShare / roleGMStrengthWeakness
TSMC (self)Adv. foundry ~90%+~68%N3/N2 + CoWoSTaiwan concentration
Samsung FoundryDistant #2LowerGAA process betYield / trust gap
Intel FoundryCatch-upSubscaleUS capacity + CHIPSExternal wins still thin
As of 2026-07-16

Management

CEO C.C. Wei long-tenured; finance/comms bench stable. No material operating C-suite upheaval in 24m (board chair transitions watched). Stability: steady.

Key management (24m)

Key management (24m)
RoleNameSince24m change
CEOC.C. Wei2018-06No change
CFO / SpokespersonWendell Huang2019No material change
ChairMark Liu (through transition) / boardChair succession monitored; ops continuity via CEO
As of 2026-07-16

Outlook

Company guide · Q3 / FY26

Company guide · Q3 / FY26
ItemGuideNote
Q3 营收US$44.6–45.8B中值 ~$45.2B;+38% YoY 量级
Q3 毛利率65–67%N2 爬坡初期略稀释 mix
Q3 营业利润率56–58%
FY26 营收增长略超 +40% USDAI 需求持续上修
FY26 CapEx$60–64B较此前指引上修
As of 2026-07-16

Framework:

  • Q3 revenue US$44.6–45.8B (midpoint ~$45.2B) implies ~+38% YoY—AI demand not slowing;
  • Q3 GM 65–67% slightly below Q2 67.7%, reflecting early N2 ramp mix dilution;
  • FY26 CapEx $60–64B confirms TSMC is still in "expand, not contract" mode—N2, Arizona Fab 21, Japan JASM are priorities;
  • Full-year revenue growth "slightly above +40% USD" is an unusually strong guide, implying H2 2026 still has acceleration room.

Scenarios

Scenario Conditions Implication
Bull Q3 >$46B; N2 yield beats; CoWoS bottleneck eases; FY26 >+45% Capacity pricing power strengthens; ADR continues up
Base Q3 ~$45B; FY26 +40% USD; CapEx $62B on track Steady growth; hold as core allocation
Bear AI CapEx slows; N2 yield issues; Taiwan Strait escalation ADR -15–25%; geo discount widens

Positioning frame (research only): core AI infrastructure holding; geopolitical risk requires position-size discipline. Not an all-in bet but a solid anchor in a semi portfolio.

Risks